5

I am pouring concrete for deck footings. I need an 18in diameter footing to carry the weight, and I will also use a 8 in diameter pier to bring it to an inch above ground. The footing must be 30 in below ground and 8 in thick. I am going to use a soil form for the footing (the hole I dig) and a sono tube for the pier.

Should I pour the footing and the concrete in one pour? I worry that the concrete in the sonotube will sink down and fill the 18 in hole while it sets, or is concrete thick enough to not worry about this? Or should I pour the footing, and then once set pour the pier. If I go this route I'll set one L shaped rebar in the footing to give support to the pier. Will an overnight set be enough?

If it matters I'll be mixing the concrete myself in an electric mixer.

Tester101
  • 133,087
  • 80
  • 327
  • 617
Michael
  • 969
  • 8
  • 18
  • 28

3 Answers3

4

I am a site coordinator for a tower construction company based in Raleigh, North Carolina. I am currently working on a project where we pour pad and pier together (because it is fairly easy and is required by our engineering department). If you get your concrete appropriately thick (3 slump?), it should stack up into your Sonotube pier without blowing out.

You still want your rebar or reinforcement mesh to extend to within a few inches of the top and bottom. You should also vibrate and rod the concrete through the Sonotube and into the footing (but try not to rod all the way through to the ground).

If you strip the Sonotube when the concrete is still green (after a couple of hours), you can rub it to a nice finish with a block of wood, a stone float or even your hand. Rubbed concrete looks professional and is an easy application, if timed appropriately.

Niall C.
  • 20,909
  • 19
  • 95
  • 135
2

Without an integrated spread footing form (Like Sonotube tube base or Bigfoot), I would split the pours.

Pour footing: Place the rebar (A pair of L bars spaced at 7 inches apart will center tube). On the next day or after firm to firm pressure (>3hrs), place tube, back-fill carefully (to keep tube centered), tamp soil.

Pour pier: Complete the pour, add post connectors while wet or use epoxy anchoring after cure.

To be thorough, I should mention Helical Piles. Guaranteed weight bearing (they keep driving them until they reach the actual PSF rating desired).

HerrBag
  • 12,225
  • 1
  • 21
  • 37
0

Yes, you can pour the footing and pier at the same time — concrete is thick enough that it won’t just sink into the footing hole, especially if mixed properly (not too wet). Just make sure the sonotube is secure and centered before pouring.

If you prefer, you can pour the footing first, let it set overnight, and then pour the pier on top. Just embed a piece of L-shaped rebar in the footing to help tie the two together. Either method works — go with what feels more manageable for you.