I've got a load-bearing 2 × 6 wall in my basement. For a bathroom remodel, I need to move one stud 3.5 inches to the right to accommodate a niche to be centered. Should I double up on the one stud I move? There are two floors above me. Do I need a header?
Asked
Active
Viewed 49 times